During the operation of 5#blast furnace in Jiusteel Hongxing Ironmaking Plant,it was found that the water tem-perature difference of some cooling walls was high,and the corresponding water pipe flow did not change,and the cooling wall water pipes were found to be intact after the blast furnace was shut down.In order to save the investment of blast fur-nace overhaul and shorten the overhaul time,a method of stacked welding was developed to fill and repair the exposed water pipes of the wear mother of the cooling walls,and semi-dry spraying was adopted after repair.It can effectively protect the embedded water pipe of the cooling wall,extend the service life of the cooling wall parent and water pipe,and ensure the safe and stable operation of the blast furnace.
关键词
高炉大修/冷却壁母体修复/焊接填补法/堆叠修复法/延长冷却壁寿命
Key words
blast furnace overhaul/cooling wall parent repair/welding filling method/stack repair method/extend the life of the cooling wall