市区高架桥箱梁顶升加高施工技术研究

Study on Construction Technology of Box Girder Jacking and Raising in Urban Area

龚伟 秦泽翔 彭光乾 滕坤 周克辉
建材世界2024,Vol.45Issue(5) :91-94,107.DOI:10.3963/j.issn.1674-6066.2024.05.022

市区高架桥箱梁顶升加高施工技术研究

Study on Construction Technology of Box Girder Jacking and Raising in Urban Area

龚伟 1秦泽翔 1彭光乾 2滕坤 3周克辉3
扫码查看

作者信息

  • 1. 武汉机场路发展有限公司,武汉 430014
  • 2. 武汉理工大学,武汉 430070
  • 3. 湖北楚天联发路桥养护有限公司,武汉 430034
  • 折叠

摘要

结合辽阳路杭鞍高架桥箱梁加高工程,阐述了箱梁在顶升加高过程中的技术要点.杭鞍高架桥地处交通密集的市区.为缓解沿线交通压力,采取箱梁的顶升加高方式来提高通行净空,改善交通状况.加高采用了相应的顶升措施和精确的控制技术,不仅高效完成了箱梁的稳定加高,而且保障了施工的安全与质量.

Abstract

Combined with Liaoyang Road Hangzhou-anshan viaduct box girder raising project,this paper expounds the technical points of box girder in the course of raising.Hangzhou-anshan viaduct is located in the urban area with heavy traffic.In order to relieve the traffic pressure along the viaduct,the box girder is jacked and raised to increase the traffic clearance and improve the traffic condition.The corresponding jacking measures and precise control technology are adopted in the heightening,which not only completes the stable heightening of the box girder efficiently,but also en-sures the safety and quality of the construction.

关键词

高架桥/箱梁/顶升加高/施工技术

Key words

viaduct/box girder/jacking and raising/construction technology