首页|EPC模式下广州市T产业园项目成本控制分析

EPC模式下广州市T产业园项目成本控制分析

扫码查看
EPC(Engineering Procurement Construction,工程总承包)以项目整体交付为目标,将工程、施工图设计及采购等发包给一个承包商负责.广州市T产业园项目为典型的 EPC模式开发项目.论文在对该产业园项目现状分析的基础上,通过 WBS(Work Breakdown Structure,工作分解结构)法分析该产业园项目成本控制.结果表明:该产业园项目工程清单单价偏高,施工总承包单位缺乏控制成本积极性等导致建设成本较高.结合该产业园项目实际情况,给出模拟清单招标、施工图限额设计、强化专业分包单位竞争等成本控制改进措施,实现建设成本可控.
Analysis of Cost Control for Guangzhou T Industrial Park Project Under EPC Mode
EPC(Engineering Procurement Construction)aims to deliver the project as a whole,contracting out engi-neering,construction drawing design,and procurement to a single contractor responsible for all aspects.The T Industry Park project in Guangzhou is a typical EPC model development project.Based on the current situation analysis of the in-dustry park project,the cost control results are analyzed using the Work Breakdown Structure(WBS)method,indica-ting that the unit price of the project's bill of quantities is relatively high,and the general construction contractor lacks the initiative to control costs,leading to higher construction costs.In combination with the actual situation of the indus-try park project,cost control improvement measures such as simulated bill of quantities bidding,construction drawing cost limit design,and strengthening competition among professional subcontractors are proposed to achieve controllable construction costs.

EPC modeindustrial park projectcost control

谢宙飞、关全力

展开 >

新疆农业大学经济管理学院,乌鲁木齐 830052

EPC模式 产业园项目 成本控制

2024

建材世界
武汉理工大学

建材世界

影响因子:0.869
ISSN:1674-6066
年,卷(期):2024.45(6)