With the diminishing of shallow mineral resources,deep mining has become an inevitable trend.With the increasingly complex hydrogeological conditions,the prevention and control of water hazards are becoming increasingly grave.The threat of water hazards is restricting the overall development progress of mines,and there is greater difficulty in controlling the water hazard especially when deep roadways pass through aquifers with complex geological conditions and fault fissure water.This article introduces the successful experience of a certain mine in successfully crossing complex fault fracture zones through comprehensive treatment methods such as geophysical exploration,grouting and water plugging in the working face,and advanced pipe-shed support.It provides reference for the treatment of water hazards in roadways of other similar mine.
关键词
断层破碎带/瞬变电磁法/工作面注浆/检查孔/超前管棚支护
Key words
fault fracture zone/transient electromagnetic method/grouting in the working face/inspection holes/advanced pipe-shed support