丹江口水库特大桥跨中无轴力连接装置施工关键技术

Key Construction Techniques of Axial-Force-Free Connectors at Midspan of Danjiangkou Reservoir Bridge

刘朝辉 周范武 于得安 高海涛
世界桥梁2024,Vol.52Issue(3) :36-41.DOI:10.20052/j.issn.1671-7767.2024.03.006

丹江口水库特大桥跨中无轴力连接装置施工关键技术

Key Construction Techniques of Axial-Force-Free Connectors at Midspan of Danjiangkou Reservoir Bridge

刘朝辉 1周范武 2于得安 2高海涛2
扫码查看

作者信息

  • 1. 湖北交投十淅高速公路有限公司,湖北十堰 442000
  • 2. 中交第二航务工程局有限公司,湖北武汉 430040
  • 折叠

摘要

丹江口水库特大桥为主跨760 m的双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,采用梁塔分离、梁台固结的结构体系.根据主桥结构体系受力需要,主梁在跨中位置断开,设置跨中无轴力连接装置+伸缩装置构造.无轴力连接装置由导梁、外部大箱梁(H梁段和H'梁段)、竖向及横向支座系统组成,导梁长13.68 m.无轴力连接装置现场安装采用导梁跨中分段(2×6.84 m)拼装、外部大箱梁逐缝合龙的施工方法.首先在总拼场地进行无轴力连接装置工厂化预拼装,并安装竖向及横向支座系统,拼装完成后将导梁断开,回位至H梁段和H'梁段进行转运;然后现场吊装匹配连接H梁段,并将H梁段内部导梁向岸侧拖动固定;之后起吊H'梁段并与前置G梁段软连接;再进行H梁段和H'梁段导梁匹配连接;导梁匹配连接完成后进行H'梁段匹配连接;最后进行斜拉索放张、桥面吊机拆除.

Abstract

The Danjiangkou Reservoir Bridge is a hybrid girder cable-stayed bridge featuring its pairs of earth-anchored stay cables.The bridge has two pylons that create a main span of 760 m and a side span-to-main span ratio of 0.2.The stay cables are arranged in double cable planes.Fixed with the abutments,instead of the pylons,the superstructure is equipped with an axial-force-free connector and expansion devices at midspan to fulfil the load bearing requirements of the structure.The axial-force-free connector consists of a 13.68 m-long guide beam,external large box beam(including H and H'sections),and vertical and transverse bearings.During installation,the two sections(each 6.84 m long)of the guide beam were assembled on site and the external large box beam was stitched joint by joint.Firstly,the axial-force-free connector was assembled to take shape in the yard,the vertical and transverse bearings were installed,afterwards,the guide beam was halved and moved back to large external box sections H and H'for transfer.Then,the H section was hoisted and connected on site,and the guide beam section inside the H section was dragged towards the bank for fixity.Afterwards,the H'section was hoisted to softly connect with the front girder section G.Subsequently,the guide beam sections inside the external large box beam sections H and H'were connected.After the connection of guide beam,the H'section was match-connected.At last,the stay cables were de-tensioned,and the deck cranes were dismantled.

关键词

部分地锚式斜拉桥/无轴力连接装置/导梁/外部大箱梁/分段拼装/逐缝合龙/施工技术

Key words

partially earth-anchored cable-stayed bridge/axial-force-free connector/guide beam/external large box girder/sectional assembly/joint-by-joint closure/construction technique

引用本文复制引用

出版年

2024
世界桥梁
中铁大桥局集团有限公司

世界桥梁

CSTPCD北大核心
影响因子:0.928
ISSN:1671-7767
参考文献量16
段落导航相关论文