Application of correction factor method in water level and flow uniformization analysis for Changqi Hydrological Station
For Changqi Hydrological Station on Fangchenghe River,based on the water level and flow measuring da-ta from 2011 to 2020,uniformization analysis of level-flow relationship was conducted by correction factor method,with the results in conformity with the specifications for flow intermittent measurement.The water level of this sta-tion can be measured intermittently within the water level range of 29.40-35.00m.During the intermittent measure-ment period,the flow can be calculated by use of the comprehensive curve of the water level and flow relationship over the years.Other water levels will be measured and calculated according to the original measurement plan.
correction factor methoduniformizationChangqi Hydrological StationFangchenghe River