首页|南宁五化灌区马兰渡槽设计方案变更分析

南宁五化灌区马兰渡槽设计方案变更分析

扫码查看
根据全国最新"三区三线"划定成果,对原南宁市五化灌区马兰渡槽设计方案进行了变更.通过将原马兰渡槽设计方案与最新"三区三线"划定成果进行比较,提出了原址倒虹吸、原址渡槽两个设计变更方案.随后,从工程占地、地质条件、结构布置、施工运维等方面分析了各设计变更方案的优缺点,综合比选确定原址倒虹吸方案为最优设计方案.
Analysis on design scheme change of Malan aqueduct in Wuhua Irrigation Zone of Nanning City
The original design scheme of Malan aqueduct in Wuhua Irrigation Zone of Nanning City has been changed based on the latest national regulations on"Three Districts and Three Lines".By comparing the original de-sign scheme of Malan aqueduct with the latest delineation results of"Three Districts and Three Lines",two new de-sign schemes of the original site inverted siphon and the original site aqueduct have been proposed.The advantages and disadvantages of two new design schemes were analyzed from the aspects of engineering land occupation,geo-logical conditions,structural layout,construction and operation maintenance.The original site inverted siphon scheme was determined as the optimal design scheme through comprehensive comparison and selection.

aqueductinverted siphondesign scheme changescheme comparison and selectionWuhua Irrigation Zone

刘惠娟

展开 >

广西水利电力职业技术学院,南宁 530023

渡槽 倒虹吸 设计变更 方案比选 五化灌区

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(1)
  • 7