大藤峡右岸厂坝工程施工重难点及其对策

扫码查看
大藤峡水利枢纽右岸厂坝工程建设难度大,工期紧张,多项指标处于国内外领先水平,技术复杂.通过对导截流、混凝土浇筑、金结与机电安装等施工中重点和难点的辨识,分析研究了相应的对策,围绕关键问题进行了技术攻关,制定了解决技术难题的具体措施,并将技术成果应用于工程实践,解决了工程难题.
Key points,difficulties and countermeasures in the construction of right bank powerhouse and dam of Datengxia Gorge Water Conservancy Project
The construction of right bank powerhouse and dam of Datengxia Gorge Water Conservancy Project is characterized by much difficulties,tight schedule,multiple indicators at a leading level both at home and abroad,complex technology.The key points and difficulties of construction such as river diversion and closure,concreting,installation of metal works and electromechanical equipment were identified,based on which the authors studied corresponding countermeasures,conducted technical breakthroughs around key issues,formulated specific mea-sures and applied the technological achievements to engineering practice to solve the technical difficulties.

key points of constructiondifficultycountermeasurepowerhouse and damDatengxia Gorge Water Conservancy Project

张松涛、谢济安、熊丰

展开 >

广西大藤峡水利枢纽开发有限责任公司,广西 桂平 537200

施工重点 难点 对策 厂坝工程 大藤峡水利枢纽

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(2)
  • 6