驮英水库工程建设征地移民安置工作实践及思考

扫码查看
驮英水库工程建设征地移民投资101969.91万元,工程淹没区、工程建设区征地投资、移民安置投资均控制在初设批复范围内,移民安置工作比原规划总体提前14个月完成.本文总结了驮英水库技施阶段建设征地移民安置工作经验,可为今后开展类似项目提供参考.
Practice and thoughts of land acquisition and resettlement for construction of Tuoying Reservoir Project
The costs of land acquisition and resettlement for the construction of Tuoying Reservoir Project is 1019.6991 million yuan.The costs of land acquisition and resettlement in submerged area and construction area are all controlled within the approved scope at the preliminary design stage.The resettlement work was completed 14 months ahead of the original plan.The author summarizes the experience in land acquisition and resettlement work at the construction drawing design stage of Tuoying Reservoir Project.

water conservancy projectresettlementland acquisition for constructionland decompositionTuoying Reservoir

刘赓劼

展开 >

广西水利电力勘测设计研究院有限责任公司,南宁 530023

水利工程 移民安置 建设征地 土地分解 驮英水库

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(2)