驮英水库泄洪隧洞由施工导流隧洞改建而成,考虑到泄洪隧洞兼有水库放空功能和冲沙功用,因此泄洪隧洞兼具三洞合一的功能.水力学计算也考虑了导流隧洞、泄洪隧洞及放空隧洞的要求.泄洪隧洞运行时,水流条件较为复杂,因此建立了水库枢纽1∶80水工整体模型及1∶80施工导流整体模型进行水工模型试验,验证了泄洪隧洞设计的可行性.
Hydraulic calculation of flood discharge tunnel for Tuoying Reservoir
The original construction diversion tunnel of Tuoying Reservoir will be modified to become flood dis-charge tunnel incorporating with reservoir emptying and sand flushing,so the hydraulic calculation took into consid-eration the requirements of diversion tunnel,flood discharge tunnel and emptying tunnel.The flow conditions were relatively complex under flood discharge operation,so 1:80 integral hydraulic model test of the overall reservoir and 1:80 construction diversion integral model test were conducted,which verified the feasibility of flood discharge tun-nel design.

construction diversion tunnelflood discharge tunnelemptying tunnelhydraulic model testTuoying Reservoir

林文豪、董蔷薇

展开 >

北海河海水利水电设计院有限责任公司,广西 北海 536000

南宁职业技术学院,南宁 530007

施工导流隧洞 泄洪隧洞 放空隧洞 水工模型试验 驮英水库