首页|大型线性水利工程建设征地工作的常见问题——以环北部湾广西水资源配置工程为例

大型线性水利工程建设征地工作的常见问题——以环北部湾广西水资源配置工程为例

扫码查看
介绍了环北部湾广西水资源配置工程的基本情况,论述了大型线性水利工程建设征地工作的特点.分析了环北部湾广西水资源配置工程在当前的建设征地工作中遇到的主要问题,并提出相应的措施和建议.
Problems frequently seen in construction land acquisition for large-scale linear water conservancy project
An introduction was made on the basic information of Guangxi Water Resources Allocation Project around Beibu Gulf,based on which the author demonstrated the features of construction land acquisition for large-scale lin-ear water conservancy project,analyzed the main problems encountered during the land acquisition for Guangxi Wa-ter Resources Allocation Project around Beibu Gulf,and put forward corresponding measures and suggestions.

compensation standardborder or corner landssoil layer zoning stackingrelocation or modification of special facilities

吕杰

展开 >

广西水利电力勘测设计研究院有限责任公司,南宁 530023

补偿标准 边角地 土层分区堆放 专项设施迁改

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(4)