Inversion analysis of"2001.7"flood in Yujiang River based on regulation of Baise Reservior
The"2001.7"flood was the largest flood that has occurred in the Yujiang River Basin since 1937.It was a once-in-20-years flood and had cause direct economic losses of hundreds of millions of yuan to people along the river.Based on Baise Multipurpose Dam Project with superior regulating capability,the Yujiang"2001.7"flood was simulated under current boundary conditions and inversion analysis was conducted.The reservoir regulation mode and timing of Yujiang River Basin was summarized,which is of great practical significance to make full use of the reservoir for scientific and rational regulation,play the role of the reservoir in flood retaining and peak cutting,and minimize the flood disaster to the greatest extent possible when encountering similar floods in the future.
flood simulationtimingreservoir regulationreduce flood peak by retaining and storing runoffBaise Multipurpose Dam ProjectYujiang River