Analysis of water system connection scheme for beautiful waterscape rural construction pilot project along Shigou River in Binyang County
As the components of water system connectivity project,a new water intake sluice will be built nearby Wangba dam on Shigou River;a new water diversion pipe will connect Shigou River with the main canal of Wuhua Irrigation Zone as well as the pond inside an old mansion,so as to realize ecological water replenishment for the pond.Meanwhile,the drainage facilities at Dongqi dock will be modified,including a new overflow weir will be built,and the drain channel will be reconstructed to discharge water into Shigou River.This project is able to pre-vent waterlogging in the old mansion while realizing the water system connection between river,pond and canal.
water intake sluicewater diversion pipeecological water replenishmentwater system connectionBin-yang County