首页|百色水库灌区跨江沉管施工重难点及对策

百色水库灌区跨江沉管施工重难点及对策

扫码查看
介绍沉管施工的特点以及施工流程,重点探讨了百色水库灌区工程跨江沉管施工的重点、难点内容.分析了沉管施工平台布置、水下基础处理、砂垫层回填、沉管结构下沉、对通航能力的影响等方面,并提出了应对策略与技术措施.
Key and difficult issues and countermeasures of cross-rive immersed tube construction in Baise Reservoir Irrigation Zone
An introduction was made on the characteristics and procedures of immersed tube construction,with the emphasis put on the key and difficult issues of the cross-rive immerse tube construction in Baise Reservoir Irriga-tion Zone.Analysis was made on the layout of immersed tube construction platform,underwater foundation treat-ment,backfilling of sand cushion layer,sinking of immersed tube structure and the impact on navigation capacity,based on which corresponding countermeasures and technical measures were proposed.

immersed tubeconstruction platformunderwater rock excavationunderwater foundation treatmentim-pact on navigationBaise Reservoir Irrigation Zone

陈炳贵

展开 >

广西水利电力勘测设计研究院有限责任公司,南宁 530023

沉管 施工平台 水下石方开挖 水下基础处理 通航影响 百色水库灌区

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(6)