高强度预应力管桩水压爆破拆除设计与施工

扫码查看
水下混凝土拆除及钢筋切割通常需要工人潜水作业,具有危险性大、耗时长、成本高等特点.为解决上述问题,本文介绍了某船业公司实施高强度预应力管桩水压爆破拆除工法.论述了其工艺原理及拆除布置、爆破条件及参数设计、爆破方案选择.该方法在安全性、控制飞石、提高施工效率、缩短工期、节约成本等方面优势显著.
Design and construction of hydraulic blasting demolition of high-strength pre-stressed pipe piles
Underwater concrete demolition and steel bar cutting usually require workers to dive,which is highly dan-gerous,time-consuming and costly.In order to solve the above mentioned problems,an introduction is made on the hydraulic blasting demolition method of high-strength pre-stressed pipe piles which is adopted by a shipping com-pany,including the technical principles,demolition layout,blasting conditions,parameter design,blasting plan se-lection etc.This method has significant advantages in safety,controlling flying rock,improving construction efficien-cy,shortening construction period and saving cost.

pre-stressed pipe pilehydraulic blastingconstruction technology

刘俊宏、周煜翔

展开 >

广西水利电力职业技术学院,南宁 530023

预应力管桩 水压爆破 施工技术

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(6)