右江水力发电厂220kV GIS高压断路器控制柜技术改造

扫码查看
右江水力发电厂220 kV GIS高压断路器控制柜用于完成高压断路器、隔离开关、接地开关的分合闸操作,以满足线路安全运行或线路停电安全检修的要求.投运将近20年,系统元件老化,二次回路设计不合理,系统稳定性差、故障频率高,不能满足电网新的技术标准和反措要求,需要进行升级改造,提高设备的安全性、灵活性、快速性、准确性,以满足厂网的安全、稳定运行.介绍了高压断路器控制柜技术改造方法和过程.
Technical transformation of 220kV GIS high-voltage circuit breaker control cabinets for Youjiang Hydropower Plant
The 220kV GIS high-voltage circuit breaker control cabinets of Youjiang Hydropower Plant are used to open and close the high voltage circuit breakers,disconnectors and ground switches,so as to meet the requirements of safe operation of power lines or safe maintenance during power outages.The current cabinets have been put into operation for nearly 20 years.Aging of system components and improper design of secondary circuits resulted in poor system stability and high fault frequency,which is unable to meet the new technical standards and anti-major accident measures requirements of the power grid,so technical transformation is required to improve the safety,flex-ibility,speed and accuracy of equipment for the safe and stable operation of station power grid.An introduction is made on the technical transformation method and process of high-voltage circuit breaker control cabinets.

GIS 220kV high-voltage circuit breakertechnical transformationdisconnectorcommissioningYouji-ang Hydropower Plant

赖江静、韦仁能

展开 >

广西右江水利开发有限责任公司,广西 百色 533000

220 kV GIS高压断路器 技术改造 隔离开关 调试 右江水力发电厂

2024

广西水利水电
广西水利电力勘测设计研究院

广西水利水电

影响因子:0.135
ISSN:1003-1510
年,卷(期):2024.(6)