Design of wind power project connecting to power system considering the influence of power grid peak regelation
Because wind power itself belongs to anti-peak regulating power supply,it brings peak regulating pres-sure to the connected power grid.Therefore,the design of wind power project connecting to power system should take into account the actual situation of power grid peak regulation such as the loads of local grid and seasonal pow-er generation.Taking Huluding Wind Power Project in Guilin City,Guangxi as an example,the factors taken into ac-count include the installed capacity and construction schedule of the project,the planning and construction of near-by power grid and other wind power projects,the impact of flood season,dry season,high load and low load condi-tions;schemes of the wind power project connecting to power grid were proposed based on the power flow calcula-tion of the connecting system under four conditions in 2025;the final scheme was determined after the economic and technical aspects of various schemes were compared.
wind power projectdesign of connecting to power systempeak regelation of power gridHuluding Wind Power Project