Research on SCADA Design of Equipment for Producing Bi2Te3 Thermoelectric Materials
Bi2Te3-based thermoelectric materials are widely used because of their highest thermoelectric merit(ZT≈1)at room temperature,and is the only successful commercial thermoelectric material at present.In order to realize the real-time storage of Bi2Te3 production data and improve the running efficiency of equipment through integrated management and control,the Bi2Te3 thermoelectric material production equipment SCADA is designed,to realize the real-time data acquisition and Operation Monitoring of the whole process.It is proved that the system is easy to set up,stable in operation,and can meet the requirements of integrated monitoring,storage and analysis of Bi2Te3 thermoelectric material production equipment.