考虑工件优先级的混合工作日历下FJSP多目标调度方法
FJSP Multi-objective Scheduling Method Takes into Account Mixed Workday of Job Priority
张迪 1曾强1
作者信息
- 1. 河南理工大学工商管理学院,河南 焦作 454000
- 折叠
摘要
考虑工件优先级,提出了一种混合工作日历下FJSP多目标调度优化方法.描述了考虑工件优先级的混合工作日历下的FJSP调度问题,建立了优化目标函数;设计了改进的非支配排序遗传算法(NSGA Ⅱ)用于求解该问题;通过案例分析验证了所提方法的有效性.
Abstract
Considering the jobs'priority,a multi-objective scheduling method of FJSP under mixed work calendar is proposed in this paper.The multi-objective scheduling method of FJSP under mixed work calendar considering the jobs'priority is described and the optimization objective function is established.An improved non-doing sorting genetic algorithm(NSGA Ⅱ)is designed to solve above problem.The effectiveness of the proposed method is verified by case study.
关键词
工件优先级/多目标优化/混合工作日历/NSGA/ⅡKey words
Jobs'priority/multi-objective optimization/mixed work calendar/NSGA Ⅱ引用本文复制引用
基金项目
河南省高校基本科研业务费专项资金资助项目(SKJZD2023-01)
出版年
2024