FJSP Multi-objective Scheduling Method Takes into Account Mixed Workday of Job Priority
Considering the jobs'priority,a multi-objective scheduling method of FJSP under mixed work calendar is proposed in this paper.The multi-objective scheduling method of FJSP under mixed work calendar considering the jobs'priority is described and the optimization objective function is established.An improved non-doing sorting genetic algorithm(NSGA Ⅱ)is designed to solve above problem.The effectiveness of the proposed method is verified by case study.
Jobs'prioritymulti-objective optimizationmixed work calendarNSGA Ⅱ