首页|某钨冶炼废水处理系统升级改造工程实例

某钨冶炼废水处理系统升级改造工程实例

扫码查看
针对钨冶炼废水高盐分、含COD和氨氮、水质相对复杂等特点,采用预处理除氟-电化学除COD和氨氮-纳米晶磁沉淀的组合工艺进行处理,工程运行结果表明,COD的质量浓度从350~400 mg/L降到20~50 mg/L,氨氮的质量浓度从50~80 mg/L降到5 mg/L以下,氟化物的质量浓度从100~150 mg/L降到5~8 mg/L,出水水质达到GB 18918-2002《城镇污水处理厂污染物排放标准》中的一级B标准要求后直接排放.
A project example of upgrading and reconstruction of tungsten smelting wastewater treatment system
In view of the characteristics of tungsten smelting wastewater such as:high salinity,COD and ammonia nitrogen-containing,relatively complex quality,and so on,a combined process of pretreatment defluori-nation-electrochemical COD and ammonia nitrogen removal-nanocrystalline magnetic sedimentation,was adopted for its treatment.The operation results of the project showed that,the mass concentrations of COD,NH3-N,and fluoride decreased from 350-400,50-80 and 100-150 mg/L respectively to 20-50,below 5,5-8 mg/L respec-tively.The effluent water quality met the requirement of level B grade 1 in GB 18918-2002 Discharge standard of pollutants for municipal wastewater treatment plant,and can be discharged directly.

tungsten smelting wastewaterhigh salinitydefluorinationelectrochemistrynanocrystalline magnetic sedimentation

刘汉阳、周剑雄、蒋敏、邓军

展开 >

长沙华时捷环保科技发展股份有限公司,长沙 410000

钨冶炼废水 高盐 除氟 电化学 纳米晶磁沉淀

2024

工业用水与废水
东化工程科技股份有限公司

工业用水与废水

CSTPCD
影响因子:0.649
ISSN:1009-2455
年,卷(期):2024.55(5)