Process design and experience summary of an underground sewage treatment plant
To address the scarcity of urban land resources and the high standards for effluent discharge,a combined process of aeration grit setting tank-multi-stage AAO biological pool-denitrification deep bed filter-air flotation pool-ultraviolet disinfection was adopted in an undergraound sewage treatment plant,the effluent water quality complied with the requiremets of DB 34/2710-2016 Discharge standards of pollutants for urban wastewa-ter treatment plants and major industrial sectors in Chaohu basin.The content of BOD5,NH3-N and TP met the requirement of class Ⅳ in GB 3838-2002 Environmental quality standards for surface water,and the phospho-rus removal target:ρ(TP)≤ 0.1 mg/L can be achieved.The process selection,process flow,process layout and design parameters of the main structures of the underground sewage treatment plant were introduced with the characteristics of the process design summarized at the same time.The actual operation results showed that,the said sewage treatment plant had a reasonable process technology,stable operation and the effluent water quality met the design requirements.
underground sewage treatment plantaeration grit setting tankmulti-stage AAO biological pooldenitrification deep bed filterair flotation pool