Design of"one enterprise one pipe"sewage collection and monitoring system in a chemical industrial park
The standardized construction of the sewage collection system of a chemical industrial park adopts the method of"one enterprise one pipe,open pipe with pressure transportation"to solve the problems of the existing buried sewage pipe network,such as old,damaged,misconnected,enterprise sewage illegal discharge and leakage,unable to monitor or control,and so on.The"one enterprise one pipe"sewage collection system en-ables the sewage of each enterprise to be separately transported to the sewage treatment plant through the pres-sure open pipe,eliminates the hidden danger of buried drainage pollution,so as to ensure the stable operation of the sewage treatment plant to meet the standard.The online monitoring system can monitor and control the drainage water quality and quantity of enterprises in real time,curb environmental pollution from the source,im-prove the ecological environment of the chemical industrial park,and provide guarantee and support for the green development and intelligent management of the chemical industrial park.
chemical industrial parksewage collectionone enterprise one pipeopen pipe with pressure transportationonline monitoringpipe rack