Construction Method Research and Monitoring of Cantilever Structure of Liuzhou railway station
Considering Liuzhou Railway Station elevated floor's cantilever structure,it has been ana-lyzed by Finite element method that is the internal force,deformation,cracks under different working conditions whether the temporary support is returned to the top and the temporary sup-ports are removed during the construction stage are analyzed.It is determined that is It is relative-ly reasonable method that temporary support should be installed on the upper part of the cantile-ver plate,and setting on the lower part for returning to the top,and removing temporary support and temporary support in the later stage.In order to ensure safe construction,a static level was used to monitor the deflection.Through monitoring,it was found that the deformation met the regulatory requirements,ensuring construction safety.
construction monitoringdeflectionconstruction conditionsstatic leveling instrument