首页|塔吉克斯坦某水电站水力机械过渡过程计算分析

塔吉克斯坦某水电站水力机械过渡过程计算分析

扫码查看
为了保证水电站的安全经济运行,采用有压管道非恒定流数学模型和特征线法,并使用计算机软件MATLAB对塔吉克斯坦塞布佐水电站的大波动和小波动过渡过程典型工况进行数值计算研究.根据计算结果和数值分析,确定配水管最大压力、机组最大转速等参数,为引水系统结构设计提供依据,并对机组的稳定运行方式提出合理的建议和要求.
Numerical Analysis of the Hydraulic Machinery Transition Process in a Hydropower Station in Tajikistan
To ensure the safe and economic operation of the Sebzor Hydropower Station in Tajikistan,numerical analysis is carried out in MATLAB software with the mathematical model for unsteady flow in pressurized pipelines and the char-acteristic line method to study the typical operating conditions in large and small fluctuation transition processes of the station.Then,based on the calculation results,operation parameters such as the maximum pressure of the distribution pipes and the maximum speed of the units are determined,which provide useful basis for the structural design of the wa-ter diversion system.Also,reasonable suggestions and requirements are proposed for the stable operation mode of the u-nits.

hydropower stationPelton turbinelarge fluctuation transition processsmall fluctuation transition processnumerical calculation

钟海锋、黄欢、余海龙

展开 >

东方电气集团国际合作有限公司,四川 成都 611731

武汉珞珈天成水利电力技术有限公司,湖北 武汉 430072

水电站 冲击式水轮机 大波动过渡过程 小波动过渡过程 数值计算

2024

水电与新能源
湖北省水力发电工程学会 湖北能源集团股份有限公司

水电与新能源

影响因子:0.301
ISSN:1671-3354
年,卷(期):2024.38(9)