BIM design is conducted in Nianpanshan Water Conservancy Project.Due to the large quantity,varying pile lengths,and difficulty in engineering quantity calculation in the design of the pile foundation of sluice gates,traditional two-dimensional and three-dimensional pile foundation design and arrangement is complicated and time-consuming.Based on the parameterized and modularized design functions in Dynamo,rapid arrangement of a large number of foun-dation piles is explored.It achieves the rapid modeling,drawing and engineering quantity statistics of a large number of piles,which greatly reduces the human calculation errors and improves the statistical accuracy,leading to significant im-provements in design efficiency and accuracy.
关键词
BIM/Dynamo/for/Revit/参数化/碾盘山水利枢纽/桩基
Key words
BIM/Dynamo for Revit/Parameterization/Nianpanshan Water Conservancy Project/pile foundation