基于三维有限元方法建立能够综合考虑复杂地质条件下深埋特长引水隧洞开挖进度、初期支护时机效应的仿真模型,以揭示不同二衬实施时机对衬砌结构承载性能的影响规律.研究结果表明:理论上是实施二衬越晚越有利于二衬的长期安全稳定运行.但是当围岩和初衬承担超过 90%的开挖荷载时,若初衬的钢支撑产生屈服,围岩塑性区明显增大,就会影响结构安全,而围岩和初衬承担约 80%开挖荷载时实施二衬,能更充分发挥初衬与二衬的联合承载性能.
On the Timing of Secondary Lining Construction for Water Diversion Tunnels with Large Deformation in Soft Rock
In order to study the influence of different timing of secondary lining construction on the load bearing perform-ance of the lining structure,a simulation model of the deep-buried extra-long water diversion tunnels under complex geo-logical conditions is established based on three-dimensional finite element method,which can consider the excavation process and the initial support timing effect.The results show that the later the construction of the secondary lining,the more beneficial it is for the long-term safe and stable operation of the lining structure,theoretically.However,when the surrounding rock and the primary lining bear more than 90%of the excavation load,the plastic zone of the surrounding rock will be increased significantly if the steel support of the primary lining yields,which will affect the structural safety.If the secondary lining is constructed when the surrounding rock and the primary lining bear about 80%of the excavation load,the combined load bearing performance of the primary and the secondary linings can be better utilized.

soft rockwater diversion tunneltiming of secondary liningload bearing performancethree-dimensional finite element method

李志刚、黄铭、闫斌、刘雪山、蔺敬军、杨帆

展开 >

中国水利水电第一工程局有限公司,吉林 长春 130033

合肥工业大学土木与水利工程学院,安徽 合肥 230009

软岩 引水隧洞 二衬时机 承载性能 三维有限元

安徽省自然科学基金"水科学"联合基金项目安徽省自然科学基金"水科学"联合基金项目安徽省自然科学基金青年项目

2208085US012308085US01JZ2023AKZR0639

2024

水电与新能源
湖北省水力发电工程学会 湖北能源集团股份有限公司

水电与新能源

影响因子:0.301
ISSN:1671-3354
年,卷(期):2024.38(10)