Slope and Foundation Treatment for Wind Turbine Positions in a Mountainous Wind Farm
Based on the analysis of possible causes of damage and stability evaluation of the typical wind turbine founda-tion in Daliangzi Wind Farm,and considering the excavation status of the wind turbine positions,supplementary geolog-ical exploration,special studies,investment estimation,construction conditions,and structural stability,the slope and foundation treatment measures are discussed.Four possible pile foundation reinforcement schemes are compared.The fourth scheme,which is of overall balanced stress,less investment,and mature construction technology,is recommen-ded and also approved by experts.After the reinforcement,the wind turbines operate well at full generation capacity.