长引水隧洞水电站过渡过程研究综述

扫码查看
针对长引水隧洞水电站过渡过程产生的特殊问题,从蜗壳最大动水压力的控制因素、调压室的位置、调压室的型式及阻抗孔的尺寸、控制工况的选取及调节系统稳定性等方面综述了研究进展.推荐了长引水电站较适用的调压室型式,提出了调节系统的调节品质及水轮机调节模式的选取与组合是有待深入研究的问题.
A Review of the Transient Process research of Long Headrace Tunnel Hydropower Station
The research progresses on the control factors of the maximum hydrodynamic pressure in the spiral casing,the position and type of the surge chamber,the size of the impedance hole,the selection of control conditions,and the sta-bility of the regulating system are summarized in response to the special problems arising from the transition process of long headrace tunnel hydropower station.The most suitable type of surge chamber for long headrace tunnel hydropower station is recommended.The regulation quality of the regulating system and the regulation mode of the water turbine are issues that need to be further studied.

long headrace tunnelwater inertiacontrol conditionssurge chamberquality of regulation

邹海青、何昌炎、刘政、王豪

展开 >

长江勘测规划设计有限责任公司机电工程设计研究院,湖北 武汉 430010

长引水隧洞 水流惯性 控制因素 调压室 调节品质

2024

水电与新能源
湖北省水力发电工程学会 湖北能源集团股份有限公司

水电与新能源

影响因子:0.301
ISSN:1671-3354
年,卷(期):2024.38(12)