Hoisting Construction Technology for the Engine Room and Hub Assembly of Offshore Wind Turbines
To ensure the smooth hoisting and installation of the engine room and hub in offshore wind turbines,a hoist-ing construction method for the engine room and hub assembly is proposed.Construction processes are introduced in de-tail,including the engine room hoisting preparation work,docking of the engine room and the hub,docking of the main engine and the hub,and hoisting of the assembly.Construction details such as the hoisting base,the connecting pieces,and the workpiece installation are also described.The proposed method can be useful reference for the hoisting construc-tion of engine room and hub of other offshore wind turbines.
offshore wind powerengine room installationhub installationhoisting construction