首页|基于设备物料清单的电网项目设备—物料联动模型研究

基于设备物料清单的电网项目设备—物料联动模型研究

扫码查看
在电网项目中,设备和物资的管理是按照不同的路径分为不同的职能部门进行管理的.这种分离式的管理造成电网企业在资产管理过程中信息中断,后期的设备和资产管理的关联和互动分离.描述了方案在设备(资产)产生的过程中,通过设备物料清单的方式关联设备同物资的关系,为建立电网企业资产管理中各个关联对象间的互动关系提供基础.
Equipment-Material Linkage Model for Power Grid Project Based on the Bill of Equipments and Materials
In power grid project,equipments and materials are managed separately in the different ways and by the different functional departments.This separated management results in the information interruption in the process of asset management,and the separation of linkage and interaction in the late equipment and asset management.This paper describes the solution correlating equipments with materials in the occurring process of equipment (assets).This method can provide the basis for building up the interaction between asset management objects in power grid enterprises.

grid projectbill of equipments and materialslinkage analysis

夏华丽、李继红、吴国威、黄海潮、史剑锋、刘金朋、劳咏昶

展开 >

国网浙江省电力公司,杭州310000

华北电力大学经济与管理学院,北京102206

电网项目 设备物料清单 联动分析

国家自然科学基金

71071052

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(1)
  • 4