Risk Elements Transmission Model in the Earlier Stage of Wind Power Project
According to the characteristics of risk elements in the earlier stage of wind power project,the distribution of risk elements is analyzed.Thereupon the risk elements transmission model in the earlier stage of wind power project is built; the occurrence probability of risk elements is determined by using fuzzy algorithm; the risk elements transmission structure is discussed; risk elements transmission algorithm with RBF neural network is established.Then calculation example is simulated; the network is trained and tested on Matlab 7.0 platform bu using the established learning sample set.The results indicate that the proposed model is correct and feasible,providing decision-making basis for risk managers in the earlier stage of wind power project.
wind power projectrisk elements transmissionfuzzy algorithmRBF neural network