首页|基于变步长动态规划的火电机组负荷优化分配研究

基于变步长动态规划的火电机组负荷优化分配研究

扫码查看
提出动态规划法运用到火电厂负荷调度中的一种变步长的动态规划算法,解决了运用等微增率法要求火电厂各机组的耗量特性曲线必须要单调递增的问题.并通过实际的算例分析证明了这一算法的可行性,可实际用于解决电力系统的规划和经济性运行等问题.
Thermal Power Unit Load Optimal Distribution Based on Variable Step-Size Dynamic Programming
This paper presents a variable step-size dynamic programming algorithm in the application of thermal power plant load dispatching,so as to solve the problem in using equal incremental,which demands that the consumption characteristic curve of each unit in the thermal power plant must be monotonically increasing.And practical example analysis has verified that this improved algorithm is feasible in solving the planning and economical operation problems of power system.

dynamic programmingcoal consumption characteristicsvariable step-sizeoptimal load distribution

张岩、黄恒孜、彭道刚、梁跃进

展开 >

宝山钢铁股份有限公司电厂,上海201900

上海电力学院自动化工程学院,上海200090

动态规划 煤耗特性 变步长 负荷优化分配

国家自然科学基金重点项目上海市“科技创新行动计划”部分地方院校能力建设专项项目上海市电站自动化技术重点实验室开放课题

6103400413160500700130Z2273800

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(1)
  • 1
  • 6