水平定向钻进电力管线敷设属于近地表开挖工程,避免不了扰动周围地层并造成地层损失,其中最主要的就是地表工后变形,变形可能导致地层的坍塌或隆起,反映到周围环境则可能是地面沉降、路面塌陷、建筑物下沉、地表冒浆等,严重的还可能造成地下管线的破损,影响电、气、讯、水、油的传输.本文基于随机介质理论对水平定向钻进电力管线敷设施工后导致的地表变形问题进行研究分析,从均匀收敛与非均匀收敛两方面,建立地表工后变形预测模型,获得地表沉降、水平变形等的计算公式,为电力管线的设计施工提供参考依据.
Prediction Model for Surface Deformation Caused by Horizontal Directional Drilling Power Pipelining
During horizontal directional drilling power pipelining,the near-surface excavation engineering,it is unavoidable to disturb the adjacent strata and cause strata damage,especially the surface deformation,which may cause the collapse or uplift of the formation,consequently the subsidence of ground,road and buildings and oozing slurry,etc.; even seriously the breakage of the underground pipeline,affecting the transmission of electricity,gas,telecommunications,water and oil.Based on the stochastic medium theory,this paper makes an in-depth research on the abovementioned surface deformation problem.From the perspectives of both uniform convergence and non-uniform convergence,the prediction model for surface deformation is set up,and the calculation formula is defined for surface settlement and horizontal deformation,etc.this research can provide reference for the design and construction of the power line.

power pipelininguniform convergencenon-uniform convergencedeformation prediction model

毛文波

展开 >

上海佳友市政建筑有限公司,上海201202

电力敷管 均匀收敛 非均匀收敛 变形预测模型

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(4)