首页|110 kV配网大容量变电站主变容量释放方案研究

110 kV配网大容量变电站主变容量释放方案研究

扫码查看
应用大容量主变时,就变容量释放问题,提出了大容量主变容量释放的几种方法,建立了110 kV变电站应用大容量主变时的容量释放模型,利用该模型可得到主变容量完全释放时,10 kV架空和电缆线路合理负载率组合,同时计算出随着架空线和电缆线仓位电流提高时的线路负载率,为110 kV变电站采用大容量主变后容量释放问题提供了解决措施.
Main Transformer Capacity Release in 110 kV Large-Capacity Substation of Distribution Network
When the large-capacity transformer is applied,the primary problem is how to release the main transformer capacity.This paper presents some methods and establishes the model for capacity release of the large-capacity main transformer in 110kV substation.Thereby,the reasonable load rate combination can be achieved for 10kV overhead line and cable line when transformer is fully released,and the line load rate can be calculated with the increase of overhead line and cable line current,providing a solution for large-capacity transformer release in 110kV substation.

large-capacity transformercapacity release modelline load rate

张铭泽、元梨花

展开 >

国网上海市电力公司经济技术研究院,上海200002

上海博英信息科技有限公司,上海200240

大容量主变 容量释放模型 线路负载率

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(7)