Development of Maintenance Work Platform for 35-110kV Steel Tubular Tower
Some problems in the maintenance of flange bolts in the steel tubular tower and the defects of maintenance tools are analyzed in this paper.Meanwhile,the scheme is proposed for the maintenance work platform of 35-110kV steel tubular tower,including the structural design,material selection and force analysis based on computer simulation.The static test and analysis of the actual working situation indicates that this new type of maintenance work platform can solve the problems of low efficiency and moving difficulty in steel tubular tower maintenance,proved superior in application value and economic benefits.
steel tubular towerflange boltsmaintenance work platform