Full-Load Power Plant Electrical Testing of Ningde Nuclear Power Unit 1 and Characteristic Analysis of Its Main Parameters
This paper researches the full-power load shedding,the auxiliary power test condition,main risks and preventive measures,and the characteristic change of main electrical parameters about Ningde Nuclear Power Plant Unit 1.Finally,the performance characteristics and optimization measures are presented for the nuclear power plant.