Anti-Induction Construction Technology for Long-Distance Parallel Live Line Stringing
As a result of the limitation of land resources and the needs of the development of power grid,power parallel corridors are increasing,and newly-built lines are often parallel to one or multiple EHV and UHV Lines for a long distance.So long-distance parallel live line stringing gradually becomes normal construction state.During the construction,a series of measures,such as all-tower grounding,all conductor split grounding,improving tension insulator string short link,have been applied to eliminate effectively the induction effect of long-distance parallel live line stringing construction.