首页|华东特高压交流工程投产初期500 kV短路电流控制策略研究

华东特高压交流工程投产初期500 kV短路电流控制策略研究

扫码查看
近年来,华东区域内将构建特高压交直流混联网架,以1 000kV特高压交流输电线路联结上海、江苏、浙江、安徽和福建电网,并通过多回特高压直流与华中电网相联.电网结构的调整和新的电源接入引起华东电网短路电流控制策略的变化.简要介绍了华东电网短路电流计算方法,通过计算给出明后年华东电网短路电流的初步控制策略.
500 kV Short-Circuit Current Control Strategy in the Initial Operation Stage of East China Grid UHV AC Transmission Project
In recent years,UHV AC/DC hybrid power transmission grid has been constructing in East China,with 1000 kV UHV AC transmission lines connecting Shanghai,Jiangsu,Zhejiang,Anhui and Fujian power grid,and with multi-circuit UHV DC connecting East China Grid and Central China Grid.Adjustment of grid structure and access of new power sources are causing changes in short-circuit current control strategy for East China Grid.This paper briefly introduces short-circuit current calculation method for East China Grid,and through calculation it proposes preliminary short-circuit current control strategy for East China Grid in the next one or two years.

UHV AC power transmissionshort-circuit current

姚颖蓓、缪源诚、庄侃沁、翟海保

展开 >

国家电网公司华东分部,上海200120

特高压交流输电 短路电流

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(12)