浙福特高压投产对汛期低谷浙西南水电送出的影响

扫码查看
介绍了浙江西南部电网的电源组成和电网结构;指出了在汛期低谷时段±800 kV特高压宾金直流的满功率运行和当地水电大发对金华换流站近区500 kV通道潮流的影响;分析了±1 000 kV浙福特高压交流工程投产后电网结构和潮流分布的变化;讨论了汛期低谷时段限制浙西南地区电力送出的通道瓶颈,提出了实际调度运行中可以采取的潮流控制手段,以及在采取措施后浙江西南地区最大的水电送出能力.
Influences of Zhefu UHV AC System operation on Southwest Zhejiang Hydropower Transmission in Flood Season
This paper introduces the power configuration and structure of southwest Zhejiang power grid.During the electricity troughs of a flood season,the ± 800 kV Binjin UHV DC system and local hydro plants in Southwest Zhejiang Province all affect current overload of 500kV transmission lines nearby.The influences of ± 1000 kV Zhefu UHV AC system are analyzed,in the respect of the power grid structure and power flow distribution.The restriction factors of transmission are discussed based on the power flower of electricity troughs in a flood season.Then it presents the actual dispatching measures to control power flow,and defines the maximum hydropower transmission capacity in southwest Zhejiang after taking these measures.

UHV ACUHV DCpower flowelectricity troughdispatching control

申屠刚、陈浩、翟海保、毕元

展开 >

国家电网公司华东分部,上海200120

特高压交流 特高压直流 潮流 低谷 调度运行

2014

华东电力
华东电力试验研究院有限公司

华东电力

CSTPCD
影响因子:0.551
ISSN:1001-9529
年,卷(期):2014.42(12)
  • 3