Device Configuration for UHV Electrical Equipment Field Commissioning Test
Based on the AC UHV testing technology of Anhui-to-East China power transmission project,this paper discusses the key special equipment parameter selection in the two tests,i.e.transformer long-induced voltage-endurance test with partial discharge and GIS main circuit insulation voltage-endurance test.The main difficulties in the process of project equipment configuration are analyzed,providing reference and guidance for the future development of UHV testing technology and field testing capability.
UHVelectrical equipmentcommissioning testACLDGIS voltage-endurance test