首页|秦山第二核电厂1、2号机组核功率测量系统升级改造设计

秦山第二核电厂1、2号机组核功率测量系统升级改造设计

Nuclear Power Measurement System Modification Design for Qinshan Nuclear Power Phase Ⅱ Units 1&2

扫码查看
基于秦山第二核电厂1、2号机组核功率测量系统现状,聚焦原系统特点和存在的问题,分析核功率测量系统改造的必要性,介绍了核功率测量系统数字化改造的范围.通过秦山第二核电厂1、2号机组核功率测量系统升级改造设计,探讨了核功率测量系统数字化改造的设计理念、设计原则、设计流程,给出了核功率测量系统升级改造的框架结构设计、设计特点和具体的优化措施.本次堆外核测量系统改造升级实施期间未产生设计变更项,现场设备调试一次性成功,设备顺利投运.本次改造方案及经验可供其他核电厂核测量系统改换参考.
Based on the present situation of nuclear power measurement system of Qinshan Nuclear Power Phase Ⅱ Units 1&2,focusing on the characteristics and existing problems of the original system,this paper analyzes the necessity of the modification of nuclear power measurement system,and introduces the scope of digital modification of nuclear power measurement system.Through the upgrading design of the nuclear power measurement system of Qinshan Nuclear Power Phase Ⅱ Units 1&2,the design concept,design principle and design flow of the digital modification of the nuclear power measurement system are discussed,and the framework structure design,design characteristics and specific optimization measures of the upgrading of the nuclear power measurement system are given.There were no design changes during the upgrading of the ex-core nuclear measurement system,and the equipment on site was successfully commissioned at the first try and successfully put into operation.The modification scheme and experience can be used as a reference for the change of nuclear measurement system in other nuclear power plants.

Qinshan Nuclear Power Phase Ⅱ Units &2Nuclear power measurement systemDigital modificationSystem design

张芸、王银丽、田野、罗炜、黄有骏、卓祥林、何佳佶、李梦书、孙琦

展开 >

中国核动力研究设计院核反应堆系统设计技术重点实验室,成都,610213

中核核电运行管理有限公司,浙江嘉兴,314300

秦山第二核电厂1、2号机组 核功率测量系统 数字化改造 系统设计

2024

核动力工程
中国核动力研究设计院

核动力工程

CSTPCD北大核心
影响因子:0.3
ISSN:0258-0926
年,卷(期):2024.45(5)