首页|近距离煤层采空区下巷道支护优化设计

近距离煤层采空区下巷道支护优化设计

扫码查看
针对双马一矿12201运输巷变形破坏严重的问题,结合双马一矿11号和12号近距离煤层实际赋存环境,运用FLAC3D软件分析掘巷、工作面回采围岩应力演化规律.模拟结果显示,在掘巷期间两帮出现不对称应力升高区.工作面回采稳定后,运输巷采空区帮转为应力降低区,而实体煤帮在多重扰动作用下,巷帮侧向支承压力明显升高.根据模拟结果对巷道支护进行优化设计,巷帮采用全锚索支护并且增加锚杆索支护密度.现场实测表明,两帮围岩变形100d内稳定在300 mm,顶板变形量稳定在200 mm,优化支护方案明显减少了巷道围岩变形量,巷道锚固圈稳定,有效控制围岩变形.
Optimization design of roadway support under goaf of close distance coal seam
Aiming at the serious problem of deformation and failure of No.12201 transportation roadway,combined with the actual occurrence environment of No.11 and No.12 close distance coal seams in Shuangma No.1 Mine,FLAC3D software was used to analyze the stress evolution law of surrounding rock in roadway excavation and face mining.The simulation results showed that during the roadway excavation,the two sides had asymmetric stress increase area.After the mining of No.12201 Face was stable,the goaf side of the transportation roadway was converted into a stress reduction area,and the lateral abutment pressure of the solid coal side was significantly increased under the action of multiple disturbances.According to the simulation results,the roadway support was optimized.Full anchor cable support was adopted in roadway side and increased the support density.The field measurement showed that the deformation of the surrounding rock of the two sides was stable at 300 mm for one hundred days,and the deformation of the roof was stable at 200 mm.The optimized support scheme obviously reduced the deformation of the surrounding rock of the roadway,the anchorage ring of the roadway was stable,and the deformation of the surrounding rock was effectively controlled.

close distance coal seamsstress evolutionmultiple disturbancessupporting optimizationfull anchor cable supportsupport density

周阳、马晓龙

展开 >

国家能源集团宁夏煤业有限责任公司,宁夏银川 750000

近距离煤层 应力演化 多重扰动 支护优化设计 全锚索支护 支护密度

2024

煤炭与化工
河北省化学工业研究院

煤炭与化工

影响因子:0.246
ISSN:2095-5979
年,卷(期):2024.47(1)
  • 10