首页|大埋深沿空掘巷非对称支护技术的数值模拟研究

大埋深沿空掘巷非对称支护技术的数值模拟研究

扫码查看
针对充填开采沿空巷道支护过程中的非对称性大变形难题,以邢东矿11216运料巷为实例,运用数值模拟确定不同支护方案下的预应力场分布特征.模拟结果表明,综合考虑支护效果和成本,顶锚索呈"3-3-3"排布、实体煤帮锚索为双排排布、煤柱帮锚索为单排排布的支护方案最好.现场围岩形变观测结果表明,支护方案能够有效控制巷道形变.
Numerical simulation of asymmetric support technology in roadway excavation along goaf with large buried depth
Aiming at the problem of large asymmetric deformation in the supporting process of goaf roadway in filling mining,the distribution characteristics of prestressed field under different supporting schemes were determined by numerical simulation with the case of No.11216 transport roadway in Xingdong Mine.The simulation results showed that,considering the support effect and cost comprehensively,the top cable arrangement was 3-3-3,the solid coal wall cable arrangement was double,and the coal pillar wall cable arrangement was single.The in-situ deformation observation results of surrounding rock showed that the support scheme could effectively control the deformation of roadway.

large burial depthfilling miningroadway excavation along goafasymmetric deformationtop cable arrangementhelp anchor cable layouteccentricity

杜乐乐

展开 >

冀中能源股份有限公司邢东矿,河北邢台 054000

大埋深 充填开采 沿空掘巷 非对称形变 顶锚索布置 帮锚索布置 偏心距

2024

煤炭与化工
河北省化学工业研究院

煤炭与化工

影响因子:0.246
ISSN:2095-5979
年,卷(期):2024.47(3)
  • 10