Rationality Analysis of Water Withdrawal from Longshan Reservoir Project in Panzhou City,Liupanshui City
The rationality analysis of the reservoir project water intake is of great engineering significance to ensure the rational development,utilization and optimal allocation of water resources in the area where the reservoir project is located,and to realize the comprehensive goal of conservation,protection and management.Therefore,the analysis of typical practice cases of water extraction in Longshan Reservoir Project in Liupanshui.The results show that,the project overview is familiared with.First of all,the rationality analysis of water intake of Longshan Reservoir Project is implemented from three aspects of the analysis of water withdrawal and related policies,the analysis of conformity of planning,the analysis of water resources development conditions and the analysis of conformity of allocation,which mainly includes the compliance of water resources allocation and the compliance of three red lines.At the same time,water demand forecast,supply and demand balance analysis and rationality analysis of water use are focused on.The water demand forecast mainly includes Yiren Valley tourism water demand forecast and industrial water demand forecast.The supply and demand balance analysis includes primary balance analysis and secondary balance analysis.Water use rationality analysis includes water use efficiency analysis and total water use control index analysis.It can provide reference for water intake and rational analysis of similar reservoir projects.
Liupanshui CityLongshan Reservoir Projectrationality of water intakeanalysis