Analysis of Water Resource Supply and Demand Balance and Tunnel Reinforcement Scheme in Yuma Irrigation District
According to the analysis of water supply and demand balance in irrigation district,the total annual water supply with the design guarantee rate of 50%can meet the water demand of the project.Through rechecking and analyzing,the normal intake of water along the line is not affected.The safe water delivery capacity is increased.The water leakage is reduced.It can provide reference for similar irrigation district engineering reconstruction and reinforcement.
irrigation areawater resourcesbalance of supply and demandtunnel reinforcement