Research on Construction Technology of Concrete Anti-seepage Wall in the Reinforcement of Xiaohulou Reservoir
During the construction of the hydraulic engineering concrete cut-off wall,due to the lack of analysis of the objective environmental conditions of the reservoir,the impervious performance of the cut-off wall can not meet the needs of the reservoir reinforcement project.Thus,the construction technology of concrete cut-off wall in the reinforcement of Xiaohulou Reservoir is put forward.According to the standards that the water reducing rate should be controlled more than 25%,the air content should be controlled less than 5.0 within 28 days,and the shrinkage rate of concrete should be controlled less than 110.0%,the specific concrete construction should be prepared.Based on the calculation of the actual hydraulic conditions,the concrete parameters of the bottom width of the concrete cut-off wall are determined.Finally,grouting holes are set on the anti-seepage wall frame to carry out grouting construction and complete the construction of the concrete anti-seepage wall.In the test results,the cumulative seepage flow is stable within 10.0 Lu during the test period,and within 1.5 Lu in a single period,which can meet the needs of reservoir reinforcement projects.
reservoir reinforcementconcrete cut-off wallconcrete preparationhydraulic conditionsbottom width of cut-off wallgrouting construction