河南水利与南水北调2024,Vol.53Issue(2) :47-48.

龙坝口水库工程防渗方案比选

Comparison and Selection of Seepage Control Scheme of Longbakou Reservoir Project

赵兴群
河南水利与南水北调2024,Vol.53Issue(2) :47-48.

龙坝口水库工程防渗方案比选

Comparison and Selection of Seepage Control Scheme of Longbakou Reservoir Project

赵兴群1
扫码查看

作者信息

  • 1. 贵州省仁怀市水务局,贵州 仁怀 564500
  • 折叠

摘要

水库工程防渗方案比选是水库除险加固工程防渗处理的重要技术环节,对科学设计防渗处理措施具有十分重要的工程意义.为此,结合仁怀市喜头镇共和村境内龙坝口水库工程除险加固防渗处理方案比选实践案例展开分析研究.了解工程概况,研究龙坝口水库工程渗漏特点;通过分析水平防渗和垂直防渗方案特点,完成龙坝口水库工程防渗方案比选;同时围绕防渗帷幕灌浆线路布置及防渗帷幕灌浆线路比选实施防渗帷幕灌浆线路比选;最终确定龙坝口水库工程防渗方案.可为类似水库工程除险加固防渗方案比选提供借鉴参考.

Abstract

The comparison and selection of seepage control scheme of reservoir engineering is an important technical link of seepage control treatment of reservoir reinforcement engineering,which has great engineering significance for the scientific design of seepage control treatment measures.Therefore,the practice case of the reinforcement of Longbakou Reservoir Project in Gonghe Village,Xitou Town,Renhuai City is studied.The project situation is understood.The leakage characteristics of Longbakou Reservoir Project are studied.The comparison of anti-seepage scheme of Longbakou Reservoir Project is completed by analyzing the characteristics of horizontal and vertical anti-seepage scheme.At the same time,the anti-seepage curtain grouting line layout and the anti-seepage curtain grouting line comparison selection are implemented.Finally,the anti-seepage scheme of Longbakou Reservoir Project is determined.It can provide a reference for the comparison of the reinforcement and seepage prevention schemes of similar reservoir projects.

关键词

龙坝口水库工程/防渗处理/防渗方案/比选

Key words

Longbakou Reservoir Project/seepage prevention treatment/seepage prevention scheme/comparison

引用本文复制引用