Project Management and Optimization Measures of Dredging and Expanding Project of Miaozhai Reservoir
The dredging and expanding project of a reservoir is an important project for maintaining function and extending lifespan.A project schedule management and optimization measure has been proposed for the dredging and expanding project of Miaozhai Reservoir.In the process,the general situation of the dredging and expanding project of Miaozhai Reservoir is analyzed.The project monitoring system is constructed by using the global navigation satellite system detection device and computer system.Subsequently,a work breakdown structure model is constructed to optimize the project schedule.The experimental results indicate that when using the research method for construction,the actual total labor days are 13,211 days,which is less than the planned 15,557 days.It shows that the research method can effectively manage and optimize the progress of the project schedule.
dredging and expanding projectproject managementWin-Win Algorithwork breakdown structure