首页|小坝河闸站改造工程研究

小坝河闸站改造工程研究

扫码查看
小坝河闸站改造工程涉及到多个领域的技术问题,如水利工程、土木工程、环境工程、机电工程等。文章通过对小坝河闸站改造工程研究,确立了施工项目的重难点,并有针对性地实施相应的解决措施。小坝河闸站改造工程施工中的重难点主要包括内河侧护坦冲刷严重及环保难点,小坝河闸站改造工程施工中泵站、闸室重难点;解决措施包括内河侧护坦的施工及环保措施,小坝河闸站改造工程泵站、闸室施工措施。研究结果表明,立足工程实际问题,有针对性地提出相应技术措施,可以保证小坝河闸站改造工程质量,实现其建设目标。
Research on the Renovation Project of Xiaobahe Gate Station
The renovation project of Xiaobahe Gate Station involves technical issues in multiple fields,such as water conservancy engineering,civil engineering,environmental engineering,electromechanical engineering,etc.Through the study of the renovation project of Xiaobahe Gate Station,the key and difficult points of the construction project are clarified,and the corresponding solutions are implemented.The key and difficult points in the construction of the Xiaobahe Gate Station Renovation Project mainly include severe erosion of the inner river apron and environmental protection difficulties,as well as the key and difficult points in the construction of the pump station and gate chamber in the Xiaobahe Gate Station Renovation Project.The solution measures include the construction and environmental protection measures of the inner river apron,as well as the construction measures of the pump station and gate chamber for the renovation project of the Xiaoba River Gate Station.The research results indicate that based on practical engineering problems,the targeted technical measures can be proposed to ensure the quality of the renovation project of Xiaobahe Gate Station and achieve its construction goals.

Xiaobahe Gate Station Renovation Projectkey and difficult pointsconstruction technique

秦乃卿

展开 >

常州市天宁区郑陆水利站,江苏 常州 213111

小坝河闸站改造工程 重难点 施工技术

2024

河南水利与南水北调
河南省水利厅

河南水利与南水北调

影响因子:0.382
ISSN:1673-8853
年,卷(期):2024.53(2)
  • 2