Analysis of Safety Review and Reinforcement Scheme of a Reservoir Dam
During the long-term use of the Xiaohulou Reservoir Dam,there have been problems such as damaged dam slope,seepage that does not meet safety requirements,and other safety hazards.It is urgent to take measures to eliminate risks and reinforce the dam.After scheme comparison and selection,the method of splitting grouting is adopted for anti-seepage reinforcement,which has advantages such as low cost and mature technology;The upstream dam slope is still protected by dry masonry,while the downstream dam slope is thickened and reinforced,and downstream drainage facilities are rebuilt.It can provide reference for similar engineering risk removal and reinforcement.